Warta Cement Plant SA – construction of crushing and transport system

Scope of the contract:

Construction of a crushing and transportation system for the extracted soil and rock masses from the Pajęczno-Makowiska deposit to the Niwiska border, including discharge into the excavation site.

Implementation of a comprehensive power supply and control system to operate all equipment of the newly built extraction installation for the Pajęczno-Makowiska deposit. The installation capacity is 3 million tons per year, with an estimated deposit exploitation period of approximately 70 years.

As part of the contract, Elproinstal performed the following work:

  • Reconstruction of the existing medium-voltage infrastructure (MV) for the needs of the new investment.
  • Supply of low-voltage (LV) power and control switchboards.
  • Supply of local control boxes (VOS).
  • Delivery of controller boxes.
  • Complete cabling of the entire installation.
  • Connection of all electric drives.
  • Construction of a fiber optic communication system.
  • Installation of supporting structures and cable system busways.
  • Reconstruction of existing electrical infrastructure for the new investment.
  • Execution of all pre-start installations and emergency shutdown systems on equipment and conveyors.
  • Comprehensive lighting installation for all equipment, transfer points, and belt conveyors.
  • Participation in commissioning and system parameterization.